Need more
information?

GTI Terminal

Ship Dock Restrictions

On barges must have min of 3mtrs from manifold to waterline for arms to connect. Min Loa 90 mtrs

Provide their own mooring lines

STNV Dock Restrictions
Jetty
Bert One (South Berth)
Dimension Minimum Maximum
DWT 20,000 177,800
LOA 125 m 276.2 m
B/CM 138 m
Draft 16.76 m
Berth Two (North Berth)
DWT 20,000 101,500
LOA 170 mtrs min 241 m
B/CM 120.7
Draft 100,000 SDWT and 80,000 mt cargo 16.76 m
Monopile
West Berth
DWT 700 ft X 90ft X 47ft 40,000
LOA Loa Beam 213.3 m
B/CM 45.7 m
Draft 14.3 m
East Berth
DWT 10,500
LOA 106.7 m
B/CM 53.3 m
Draft 9.1 m
SPM
DWT 80,000 528,000
LOA 415 m
B/CM 207 m
Draft 28.7 m
Floating Hose Station #1 (Barge loading station)
DWT 7,200
LOA 120 m
Draft 4.9 m

The finger jetty (920 meter 3018 feet long) consists of 2 berths:

Berth # 1 is localet on the south face of the jetty

Berth # 2 is on north face.

Minimun water depth is 18 meters at MD-1

At Seaward dolphin (MD-4) maximun water depth is +/- 30 meter.

The water inshore along the jetty shoals gradually.

The barge dock is at the shoreward end of the jetty in approximately 8 meters of water depth accomommodating tugs and bunkers barges.

DWT = Dead weight tons = maximun gross wight of fully loaded ship and cargo

LOA = Length over all the ship

B/CM = Bow to center of ship's manifold length